Posts Tagged ‘budget’

SQR to build sports field for Luo Shui Middle School

Tuesday, January 20th, 2009

SQR has started to build a sports field for the students of Luo Shui Middle School who are currently in a temporary boarding school outside the town. They currently have no safe place to play on and some children have hurt themselves playing on the existing rocky surface. With no safe recreational area the children easily get bored and frustrated, and there have been increased levels of schoolyard bullying and violence, the teachers have reported. Contractors secured by SQR are currently laying a red soil multi-purpose surface in the school yard. The work is budgeted to cost 13,000rmb and will be completed by the time the students return to school after the Chinese New Year. Chengdu Sports Aid, an association of several expat sporting groups and clubs in Chengdu, is helping to raise funds for the project, and once it is completed they will arrange regular sporting events on the facility.

20081225China says May 12 quake damages 14,000 schools in Sichuan

Monday, January 19th, 2009

2008年12月25日20:21 新华网

http://news.sohu.com/20081225/n261426445.shtml

BEIJING, Dec. 25 (Xinhua) — The deadly 8.0-magnitude earthquake that jolted southwestern China’s Sichuan province in May damaged close to 14,000 schools in 159 counties in the province, a senior official said on Thursday.

Lu Yongxiang, vice chairman of the Standing Committee of the National People’s Congress (NPC), China’s top legislature, revealed the numbers during a briefing to the law-making body on the enforcement of the Law on Compulsory Education.

The 8.0-magnitude quake centered in Sichuan’s Wenchuan County left more than 69,000 people dead, 374,000 injured, 18,000 missing and millions homeless.

He did not disclose the casualties of students in the earthquake.

Many of the school buildings in the quake-affected areas needed to be rebuilt, Lu said, adding that many schools in the central and the western part of the country were still in poor condition.

He noted that after the earthquake, many school buildings in neighboring Gansu province were severely damaged, but their rebuilding were not covered in the government’s post-quake rebuilding budget.

According to Lu, 2.5 percent of China’s primary and middle school buildings were in poor conditions in 2007. More than 90 percent of those “risky” school buildings were located in the country’s rural areas.

Twenty percent of the primary school buildings and 11 percent of the middle school buildings were “risky” in southwestern Yunnan province as in 2007, he said, citing figures from the Ministry of Education.

Fire risks, traffic safety and hygiene also posed threats to many primary and middle schools in the country due to lack of safety education, Lu added.

Lu urged authorities to add reinforcement measures to all school buildings in the quake-hit areas and to conduct a comprehensive safety check on all primary and middle schools in the rural areas across the country.

Local governments should renovate all school buildings to meet anti-quake criteria “at a proper time”, Lu suggested.

He also urged for central and local governments to grant more funds to help middle and primary schools– especially those in the central and western rural areas — renovate their school buildings and raise safety education among students and teachers.

China had already stipulated in July this year that school facilities must observe higher quake-proof standards than common buildings in the same area.

新华网北京12月25日电 (记者周婷玉、陈菲)全国人大常委会副委员长路甬祥25日向全国人大常委会作义务教育法执法检查报告时说,这次汶川特大地震对灾区学校造成严重破坏,相当部分校舍需要重建。据四川省统计,共有159个县近1.4万所学校受灾,其中义务教育学校和完全中学占91%。

他还指出,目前中西部地区农村学校的危房比例仍然较高。据教育部反映,2007年,全国普通中小学危房面积占普通中小学校舍面积总数的2.48%,其中90%分布在中西部地区农村。云南省小学、初中危房比例最高,分别达到20%和11%。甘肃省甘南受灾地区学校校舍受损也很严重,其中不少校舍没有列入国家资助的灾区中小学校舍维修加固资金项目,而地方财政困难,难以进行修缮。另外,一些学校的安全教育还没有落实,在消防、交通、卫生等方面也存在着安全隐患。

路甬祥介绍,新义务教育法实施后,各级政府部门在严格学校选址规划、完善校舍设计和编制建设标准、提高校舍维修改造资金测算标准、严格学校安全监管、维护学校周边秩序等方面加强了工作。2008年7月实施的《建筑工程抗震设防分类标准》,提高了学校建筑的抗震设防标准,要求比当地一般建筑抗震设防烈度提高一度,这将对保障校舍安全具有促进作用。

为进一步加强学校安全建设,执法检查报告建议,加快全面排查农村中小学校舍安全情况的进度,当前特别要做好受汶川特大地震影响的地区校舍的维修加固工作。同时,各地政府对未达到抗震要求的所有校舍,应适时制定规划予以改造,使之逐步达到防震标准。

报告中还建议,应适当提高农村中小学校舍维修改造经费补助标准,中央财政应重点对中西部地区农村中小学校舍抗震加固工作加大支持力度;应当进一步健全学校安全管理制度,完善处置突发事件应急机制,定期开展安全教育和应急演练活动,不断提高广大师生的自我保护意识与防范危害的能力。

News round-up

Saturday, January 3rd, 2009

2008-11-27, source: Sichuan News

According to relative sources from Chengdu Department of Sanitation, the work of flu vaccination in the Chengdu disaster area has been accomplished. 452,654 people from Dujiangyan, Pengzhou, and Chouzhong received a free flu vaccinations.

2008-12-02, source: Xinhua

The Central Ministry of Finance revealed the budget of 520 million RMB for post-disaster development of the Department of Meteorology in order to improve the level of its monitoring, alarming and other services, within 3 years.

2008-12-02, source: Beijing Youth Daily

According to an official in Beichuan Information Department, the initial reconstruction planning of Beichuan is has been completed. The general plan will come out in mid-December, to be deliberated and discussed by the provincial government and finally approved before January next year.

The new Beichuan, which occupies 9-10 sq km, is to be situated in An Xian, 2km away from east An Chang and 20km away from its original site. Infrastructure, including emergency sanctuary, water and electricity supply, will be established follow quake-resistant standards.

As revealed in the scheme, new Beichuan will be divided into 2 parts by An Chang River. The east part (6 sq km) is the immediate construction area, the 4 sq km centre of which will be used for first phrase construction. The other side of the river is planned for long-term use. The estimated population in east and west area will be 57-61 thousand and 38-40 thousand respectively.

To build a Qiang Minority Custom Museum and a tourist service centre is also included in the scheme.

Another focus is the rebuilding of schools and other educational institutions. It is planed that 3.91% of the construction-use filed will be employed for Beichuan Middle school, Beichuan Vocational High School, Southwestern University for Nationalities, plus other 8 primary schools and 9 kindergartens.

To sum up, 19.32 billion RMB will be invested in major projects that includes residential, educational, medical and welfare facilities as immediate objectives.

2008-12-03, source: People’s Daily

9 highways and 11 provincial motor ways, 260 thousand km in total, were severely damaged during the 5.12 Quake; a substantial loss of 56.28 billion Yuan.

On 3rd December, 29 traffic reconstruction projects in Sichuan went into operation. This includes 24 critical highways and 5 bus stations, costing 5.03 billion and 24 million RMB respectively. In addition to the 24 projects started previously, there are 53 projects undergoing, with total investment of 28.7 billion RMB, accounting for 42% of the objective of general planning. It is expected that this percentage will increase to 89% by the end of the year. And before March next year, the rest will be under construction.

2008-12-03, source: China Economic News

“The subsidy for rebuilding is 28 thousand yuan per family, but only 3000 to 5000 for repair,” said Yin Taichao, chairman of Luoshui Town Party Committee.

The policy announced in August prescribed reconstruction must apply certain structures that were designed by experts. Used material and non-professional workers could not be employed. Therefore, it will cost at least 60 thousand RMB to rebuild a house, which is apparently unaffordable to villagers, especially the elders who cannot easily get loans from bank. Consequently, most of the residents opted to apply for subsidies for repair as opposed to rebuild.

But during the last few months, aftershocks have been gradually tearing their houses apart. Simple repair is no longer an option. Further, the policy has changed: used material and hiring non-professional workers is now acceptable; the government only supervises quality-related issues. Naturally, many people have changed their minds and decided to rebuild their homes.

However, this didn’t go as smoothly as people had expected. When the new policy came out, some village heads decided to hand in the former list of villagers’ application as in good attention to “save some money for the country” and didn’t anticipate such substantial effects of aftershocks. So now the problem is, “the applicants were inputted to the government database and it’s said we can’t change it now,” said Yin. “But you’ve seen the houses, how can we just repair them? The aftershocks will last at least 2 years. They won’t last that long.”

In addition to this, it is difficult to define “per family”, since the census is inconsistent with the registration. A registered family, consisting of 10 people, could be actually 3 families. Should it be village heads’ right to decide how subsidies goes or should it be discussed by villagers? This will cause much dispute without doubt.

The story is not over. According to Yin, there are 2 institutions that distribute loans to residents, because Luoshui town is combined with 2 different towns —- therefore 2 directors of the rustic banks, one of which is so rigid that complicated and time-consuming procedures are required for loans. “(So) the reconstruction is to some extents slowed down,” said Yin.

“The objective commanded by the city council is to start 60% rebuilding projects before Spring Festival and finish 30%. But materials these days are so expensive.” Yin viewed this as the biggest problem. And this is actually the universal problem in all disaster area. “Perhaps only 50% reconstruction can be started. It’s difficult to achieve 30% completion, though there are already 3000 families working on it.”

Original Chinese versions

成都地震灾区流感疫苗接种完成

2008-11-27

来源: 四川新闻网

汶川地震灾区气象防灾减灾能力将超过震前水平

2008年12月02日

来源:新华网

为帮助汶川地震灾区气象部门高标准、高起点、高要求完成重建任务,财政部明确气象部门灾后恢复重建中央预算资金为5.2亿元,目标是用3年左右的时间,使灾区的气象监测、预警和服务能力超过震前水平。

北川规划确定县城新址

2008-12-02 北京青年报

北川新县城选址初步确定为安县安昌镇以东约2公里处,距离老县城约20公里,供水等设施可抗8级地震,北川中学将占地15公顷。昨天,北川县委宣传部一位姓廖的工作人员介绍,目前新县城重建方案已经基本出来了,正在征求意见。记者从中国城市规划设计研究院了解到,该院已于前两日向北川县汇报了新规划的内容,现在是一个初步规划,将于12月中旬完成总体规划成果编制,争取在明年元旦前完成省政府审批程序。

据规划初案显示,新北川县城将以安昌河为界分为东西两部分,安昌河以西为远景可建设用地。据当地媒体报道,安昌河以东为近期建设区,总面积6平方公里,其中适宜建设面积5平方公里,中间为一期建设核心区,为4平方公里的先期启动区,两侧为一期建设拓展区,各1平方公里。

在初案中,居住用地规划为246公顷,其中河东150公顷,河西96公顷,新县城核心区和拓展区人口规模预计为5.7万到6.1万人,河西远景区可建用地人口规模为3.8万到4万人。
在北川新县城的规划初案中,还包括旅游服务中心0.5公顷和4.2公顷的羌族民俗博物馆。

在这份初案中,教育科研设施用地40.48公顷,占建设用地比例为3.91%,而国际标准为2.4%到3.0%, 人均用地为4.1平方米/人,而国际标准为2.5平方米/人到3.2平方米/人,均高于国际标准。教育建设用地包括北川中学、北川职业中学、西南民族大学分校区和8所小学、9所幼儿园,其中地震时受到关注的北川中学占地为15公顷。

在近期重点项目投资上,列出了安置住房、文化教育设施、医疗卫生设施、社会福利设施、政权设施、基础设施,共投资193.2亿元的项目。

四川29个交通灾后重建项目启动 三年投入千亿元

来源:人民网 12月3日

据悉,四川省此次集中开工的灾后重建交通项目29个,总投资50.54亿元,其中,国省干线及重要经济干线公路项目24个,投资50.3亿元,市县级客运站点项目5个,投资0.24亿元。加上此前开工的24个项目,全省累计开工项目53个,投资287亿元,占规划目标的42%。到年底,还将开工项目54个,累计达到107个,总投资614亿元,占规划目标的89%。明年3月底前,所有项目将全部开工建设。

地震重灾区什邡洛水镇数百农户重建难题多

中国经济新闻网-中国经济时报 2008-12-03

11月21日,“汶川地震”重灾区什邡市洛水镇党委书记尹太超告诉中国经济时报记者,平坝地区重建的国家补助是每户28000元,维修是3000元至5000元不等。“当初说是要重建就统一建,说什么旧瓦、旧砖、旧木料都不许用,我们还只能照上面划定的户型选。从17万到8万多,最起码也要6万多,我们根本建不起。当时的裂口哪有这么大啊,就是一些印子。我们又不懂,以为不会有事的。哪晓得到现在余震还不断,口子越开越大,还是斜着下来,越来越长。这个样子就维修不好了,只能改成重建。可上面却不同意了,说是当初我们上报的是维修,就只能按照维修来给补助,这我们得多冤哪!”

材料报了好几次,最早大家都报的是重建。后来说房子全部推倒后材料也要报废清走,施工要请有资质的建筑队,这下子材料费、工钱都会很高,而且我们五六十岁的人还不给贷款,我当时看房子缝隙还不太大,就又在新的材料里报了个维修加固。结果报上去之后,余震不断,墙缝越来越大,要修就得推倒重新码墙。新的政策也下来了,旧材料可以用,也可以自己请人工来建,政府只是监督质量,算个账,加上国家补助,我们完全可以重建得起了。我们去找上面,找到市里,说是上报的材料已经在微机里锁定,无法修改。

另据记者了解,由于重建补助依户发放,灾后许多乡村产生了“事实分户”的问题。农村家庭过去不重视户口,分家分房不分户的情况很多。因此,政策便将究竟是否确定“事实分户”的权力下放到各村的小组会,由村民们自己根据实际情况开会决定。即便如此,还是会有扯不清的情况。洛水镇永兴村有十多户村民找到记者诉说此事。据了解,曾到镇里反映的也有上百家。对此,尹太超表示,政策有一个刚性,已经确定分户的,恐怕不能再改。

此外,洛水镇是由原来的洛水和灵杰两个乡镇合并来的。因此,重建中给农民发放贷款的机构便与其他乡镇不同——有两个信用社,虽说政策规定得很好,但实际发放贷款还是取决于信用社主任的态度。据尹太超介绍,一个主任很支持,发放起来很顺当,但另一个主任要求的手续却很繁琐,影响到了农房重建的进度。

洛水镇遭遇的众多难题中,还有一个是灾区普遍性的——建材疯狂涨价。尹太超将这看做是农房重建中最大的障碍。他说,市里给的指标是,重建的农房春节前要实现60%开工,30%完成。现在建材这么高的价,恐怕到春节也只能有50%开工,虽说已经在建的农户有3000户,但要达到春节前30%完成的指标,还是有困难。